RP5 Recycled Water Pipeline Bottleneck

 

 
 

contract amount:

$2,023,600

Owner:

Inland Empire Utilities Agency

Completed:

January 15th, 2020

 

Description:

This project consisted of installing a new surge control system with 7,500-gallon horizontal pressure surge tank, and replacement of all designated RP-5 RW campus system buried valves. We also installed new 30” and 16” electromagnetic bi-directional flow meters, new 10” and 12” pressure reducing valves, and all associated pipe, valves and fittings.