Balboa Island Water Main Replacement, Phase II
Contract:
$2,222,300
Owner:
City of Newport Beach
Completed:
May 24, 2019
Description:
T.E. Roberts, Inc. installed 4", 6", 8", 10", and 12" water main and constructed 4", 6", and 12" water valves in a very busy part of Balboa Island in Newport Beach. The project also involved open-cut method to install the C900 PVC DR14 water pipeline, and maintenance of a dewatering system throughout the project due to encountering groundwater during excavation.